6 — ONT management using an ONT interface
press enter key to continue...
where the download states are described in Table
Press ↵ to continue.
3
4
Choose option 11, Return to main menu, to return to main menu.
5
STOP. This procedure is complete.
Procedures using HTTP interface for Package C ONTs
Not applicable.
Procedures using CLI interface for Package C ONTs
Not applicable.
Procedures using butt set
Not applicable.
6.12
Rebooting an ONT
The ONT may require rebooting from time to time to recover from certain events.
Two forms of reboot are available:
•
Force reset, to reboot immediately regardless of the download state of the ONT
•
Graceful reset, to reboot after a software download is complete
This section shows you how to reboot an ONT.
Prerequisites
The prerequisites are:
•
The user access level of the ONT is read-write.
•
The steps to access the interface are completed.
•
•
•
•
Procedures using HTTP interface
The following procedure provides the steps to reboot an ONT using the HTTP
interface.
6-40
November 2013
See Procedure
6-1
for HTTP interface using the first the Ethernet port.
See Procedure
6-4
for CLI interface using the first Ethernet port.
See Procedure
6-6
for HTTP interface for Package C ONTs
See Procedure
6-8
for Package C ONT CLI interface using an Ethernet port.
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
6-10
Edition 01
3FE 55873 AAAA TCZZA
ONT Product Information Guide