NTP 124 — Install an I-010G-P, I-020G-P, and an I-040G-P indoor ONT
Ethernet (GE)
ports RJ-45
6
Connect the Ethernet cables to the RJ-45 ports (DLP 101).
7
Connect the SC/APC fiber optic cable (DLP 125).
8
Install the power supply according to manufacturer specifications.
9
Connect the power cable to the power connector.
10
If used, configure the SLID (DLP 6).
11
Verify the ONT LEDs, voltage status, and optical signal levels (DLP 127).
12
Activate and test the services (DLP 128).
13
If necessary, reset the ONT (DLP 126).
14
STOP. This procedure is complete.
NTP 124-4
November 2013
Figure NTP 124-3: I-040G-P indoor ONT connections
G E 1
G E 2
G E 3
G E 4
Reset
Power
connector
Warning — Be careful to maintain a bend radius of no less than 1.5
inches (3.8 cm) when connecting the fiber optic cable. Too small of a
bend radius in the cable can result in damage to the optic fiber.
Note — Observe the following:
Units must be powered by a Listed or CE approved and marked
limited power source power supply with a minimum output rate of
12 V dc, 1.25 A.
Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
R E S E T
P W R
Edition 01
3FE 55873 AAAA TCZZA
ONT Product Information Guide