Installation - Ricoh BE-C1 D046 Field Service Manual

Table of Contents

Advertisement

2. Installation

No.
9. Edging
10. Tapping Screws M4x8
11. Tapping Screws – M4x8
2
12. Tapping Bind Screws – M3x6
13. Screw with Spring Washer – M4x6
14. Screws M4x6
15. Step Screw M4
16. Decal – Tray 3/4
17. Harness Clamp – FCW52
Installation
• Unplug the main machine power cord before starting the following procedure.
• Before starting the installation, insert the leveling shoes under the leveling feet, and level the machine.
• The machine is very heavy. To avoid serious injury, make sure that you have a sufficient number of
people to assist, and use proper lifting equipment for lifting or moving.
• The feed tray weighs 32 kg (70.5 lb.) and requires at least two people to lift and install.
48
Description
Q'ty
1
4
4
4
1
24
4
1
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be-c1 d049

Table of Contents