Table of Contents

Advertisement

33. Attach [A] to the base of each rear copy tray support [B].
34. Attach the I/F cables of the fan fold unit [A] to the cross fold unit [B] and the main machine [C].

Power On

The fan fold unit must be switched on before the main machine.
1. Switch on the fan fold unit.
2. Switch on the main machine.
• The fan fold unit must be switched on first, so that the main machine will recognize the fan fold unit
after the main machine is powered on and starts its initialization procedure.
Folder FD6500B (Cross Folder) (B890)
2
181

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be-c1 d049

Table of Contents