Download Print this page

Inspection Date; Resistance Test Reference; Peak Voltage Out Put Test Reference - TOHATSU EverRun MX 18E2 Service Manual

Hide thumbs Also See for EverRun MX 18E2:

Advertisement

Available languages

Available languages

Electrical System

4. Inspection date

Resistance test reference

Ignition coil
Exciter Coil

Peak voltage out put test reference

Exciter Coil
C.D unit
8-10
6) Measure peak voltage at engine cranking or engine
starting.
• When measuring peak voltage at engine
cranking, remove spark plug cap from spark
plug and spark plug is attached.
• Variation occurs in output value with cranking
speed.
• For manual start model:
Cranking speed is unstable, cranking
measurement may affect reference value.
• Because numerical value of the data of each
model statement page is the minimum voltage,
if it is above this, it is in good condition.
• The faulty part it specifies, input voltage being
proper, if there is a unit whose output voltage
does not meet the minimum voltage that is the
faulty part.
Primary
Secondary
R - L
Cranking Idling
(500r/min) (1000r/min)
R - L
260V
B/Y - B
250V
0.4 ~ 0.6Ω
6.8 ~ 10.2 kΩ
210 Ω
1500r/min 3000r/min
280V
220V
280V
220V
GB
150V
140V
2st X18E2 2012

Hide quick links:

Advertisement

loading