Download Print this page

Inspection Of Thermostat; Ignition Timing Adjustment - TOHATSU EverRun MX 18E2 Service Manual

Hide thumbs Also See for EverRun MX 18E2:

Advertisement

Available languages

Available languages

Maintenance
2
3 1
2
3
3-16

8) Inspection of Thermostat

Refer to Chapter 5.

9) Ignition Timing Adjustment

1.
2.
4
5
3.
4.
5.
6
Rotate the throttle grip fully toward the FAST side until the
grip stops.
Adjust using the link rod 1 so that the timing mark 2
25°of the magneto coil plate and the ignition timing
inspection line (crank case mating surface) 3 coincide.
Adjust the stopper bolt 4 so that the advancer arm 5
touched the stopper bolt.
Ignition Timing-Full Throttle : BTDC 25°
Adjust the advancer arm link rod 6 as shown in
the figure when you adjust the ignition timing.
Rotate the throttle grip fully toward the SLOW side until
the grip stops.
Adjust the stopper bolt 6 at the position where the timing
mark 2 3°ATDC of the magneto coil plate and the ignition
timing inspection line 3 coincide.
Ignition Timing-Throttle closed : ATDC 3°
GB
2st X18E2 2012

Hide quick links:

Advertisement

loading