Download Print this page

TOHATSU EverRun MX 18E2 Service Manual page 212

Hide thumbs Also See for EverRun MX 18E2:

Advertisement

Available languages

Available languages

Power Unit
90mm
2
5-60
0
2
1
2st
2st OIL
2st OIL
24) Installing Needle Bearing and
1.
1
2.
Pipe 2 :
Inner Diameter : ø30 mm (1.181 in)
Length : 90 mm (3.54 in)
Do not reuse removed bearing.
2st OIL
2st
Pistons
CAUTION
Make sure that the piston, piston pin and
needle
bearing
combination.
Installation of Piston Rings
Complete 2nd piston first.
When attaching a piston ring, face the side of the
ring marked with "T" upward 1.
Bring piston ring gap to knock pin 2.
Installation of needle bearing
Check that the quantity of needle bearing 25
pieces, before assembling.
GB
in
their
original
2st X18E2 2012

Hide quick links:

Advertisement

loading