1-2-2 Unpacking and installation
(1) Installation procedure
Removing the tapes and spacers
Installing the main tray and jobseparator tray
Release of lift plate stopper
Loading paper
Installing the toner containers
Unlocking the developer waste exit
Installing the waste toner box
Installing optional devices
Installing the cassette heater (option)
Replacing operation panel sheet
Connect the power cord
*: *:When the finisher has been installed, the job separator tray and the main tray are not needed.
Start
Unpacking
Adjusting the image
Setting the delivery date
(maintenance item U278)
*
Output an own-status report
(maintenance item U000)
Exit maintenance mode
Print out the user setting list
Completion of the machine installation.
1-2-2
2MN/2N1-1