Figure 10-154Self Test Complete - Agilent Technologies N1911A User Manual

P-series power meters
Hide thumbs Also See for N1911A:
Table of Contents

Advertisement

Maintenance
10
Instrument Self Test
Self Test
If
is selected, the following tests are run: (These are the same
tests which are run using the *TST? command.)
• Test Point Voltages
• Calibrator
• Fan
• Battery
• Channel Peak Path
• Channel CW Path
• Channel DAP Check
As each test takes place, the name of the test is listed on the screen.
While a test is running, the message Testing... appears beside the name of
the test. As each stage of the test is completed, the Testing... message is
replaced by either Passed or Failed.

Figure 10-154Self test complete

Done
When the test is complete, the result is displayed. Press
to return to
the Service menu.
If the self test failed, information about the failure is displayed on the
screen.
N1911A/1912A P-Series Power Meters User's Guide
229

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1912aN1912a

Table of Contents