Hitachi XP P9500 User Manual page 302

Hitachi dynamic link manager software user guide for solaris (6.6) (hit5205-96011, november 2011)
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

Permanent
KAPL01001-I The HDLM command completed normally. Operation name
= view, completion time = yyyy/mm/dd hh:mm:ss
#
¢
15
Use the execution results from the view operation to check that the
.
programs are operating normally.
If HDLM Manager, HDLM Alert Driver, and HDLM Driver are all Alive,
the programs are operating normally.
16
Check the status of the path for accessing the LU to be managed by
.
HDLM.
The following shows an example of executing the command. The shaded
portion is the path accessing the LU to be managed by HDLM.
17
Delete the device ID information for devices that do not exist.
.
Execute the following command:
# /usr/cluster/bin/scdidadm -C
18
Allocate the device ID.
.
Execute the following command:
# /usr/cluster/bin/scdidadm -r
19
Notify the node of the most recent device ID information.
.
4-56
-
Even when cluster software is used, it is not displayed in Support
Cluster. Nevertheless, no problem exists with the functionality for
cluster support.
HDLM Operation
Hitachi Dynamic Link Manager User Guide (for Solaris(R))

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dynamic link manager

Table of Contents