Tools You Need At Hand - Fujitsu PRIMERGY RX2540 M7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Before you start
Step
Server shutdown
Rack removal,
disassembly
Transport
Maintenance
procedures
Transport
Assembly, rack
installation
Starting up
Table 1: Calculation of the average task duration
2.4

Tools you need at hand

When preparing the maintenance task, ensure that all required tools are
available. You will find a list of required tools at the beginning of each
procedure.
28
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance, see
maintenance task" on page
Making the server available, removing the
yes
server from the rack (if applicable).
Transporting the server to the service table
no
(where required) depends on local
customer conditions.
Maintenance procedures including
yes
preliminary and concluding software tasks.
Returning the server to its installation site
no
(where required) depends on local
customer conditions.
Reassembling the server, installing the
yes
server in the rack (if applicable).
Booting time depends on hardware and
no
software configuration and may vary
significantly.
Upgrade and Maintenance Manual
"Starting the
89.