Install The Grommet Plate For The Concrete Foundation Of The Power Cabinet - ABB Terra HP Generation 4 CE Ionity Installation Manual

Table of Contents

Advertisement

Pre-installation
Procedure
1. Make the custom foundation.
2. Guide the cables into the holes (C1)
to (C4) of the foundations. For the
relation between the cables and the
holes, refer to section 12.16.7.
3. Install the foundation in the hole.
4. Put the cables through the openings
in the foundation. Apply the full cable
slack.
For the cable slack, refer to section 12.14.2.
5. Fill the foundation with gravel or another substance to prevent rodents to enter
the cabinet.
4.5
Install the grommet plate for the concrete foundation of
the power cabinet
Preliminary requirements
Procedure
1. Contact the manufacturer to order the
grommet plate for your EVSE. Refer to
section 1.12.
2. Guide the cables through the
grommet plate (A).
3. Pull the cables through the cable conduits
in the foundation. Apply the cable slack as
per the specification on section 12.14.1.
4. Install the grommet plate on the
foundation (B).
5. Install the fasteners (C).
6. Tighten the fasteners to the correct
torque. For the specification, refer to
section 12.13.
7. Strip the insulation from the end of the
cables. Make sure that the stripped length
is compatible with the cable lug specification.
8. Install the cable lug to the end of the cables.
34
Caution: Make sure that
the top surface of the
foundation is above the
ground level, to prevent
intrusion of water.
Torque wrench
C2
C3
C1
Grommet plate
A
6AGA000032-0115-EN | 004
C4
C
B