Install Front Cover Plate On Foundation - ABB HVC Installation Manual

450 kw e-bus charger
Table of Contents

Advertisement

HVC 450 kW E-Bus Charger Installation Guide
1.
Put the front border cover (A) against the bottom front of the Power Cabinet.
2.
Put the rear border cover (B) against the rear front of the Power Cabinet.
3.
Insert the M5 bolts (C) into the holes (8x).
4.
Tighten the bolts.

5.5.8. Install front cover plate on foundation

Only applicable when the Power Cabinet is placed on a concrete
foundation.
Preconditions:
Tools: spanner (size 19)
1.
Place the front cover plate (B) on the foundation (A).
2.
Make sure that the front cover plate (B) is aligned with the tapped holes within the
foundation.
Revision: 1.2
Date released: 16-08-2018
NOTICE
COMPANY CONFIDENTIAL
Page 63 of 128

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents