Placement Of Multiple Cabinets - ABB HVC-PD Installation Manual

Hide thumbs Also See for HVC-PD:
Table of Contents

Advertisement

HVC‐PD E‐Bus Charger Installation Guide 
The HVC 150(S) has air inlets (A) on all sides and air outlet (B) on the front to control the
temperature inside the cabinet. Do not install any objects near these air inlets and outlets (see
also Caution above). If necessary, take precautions to prevent snow, sand or dust from
blocking the inlets and outlets.
Specifications for inside installation of the Power Cabinet
Airflow required for one cabinet = 853.44 CFM.
Maximum allowed pressure drop = 0,0435113 PSI. If the pressure drop of the room is higher
Contact associated Project Manager
than 0,0435113 PSI an extra fan should be placed.
or Sales representative
see Contact information on Page 14 for contact details).

3.5.2. Placement of multiple cabinets

There are some possible configurations for the placement of multiple HVC 150 systems, see
picture below.
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022
Page 29 of 146

Advertisement

Table of Contents
loading

Table of Contents