Electrical connection
40
7.1.5
Pin assignment of device plug
Pin
2
1
2
3
1
3
4
4
Coding
A0032047
7.1.6
Preparing the measuring device
Carry out the steps in the following order:
1. Mount the sensor and transmitter.
2. Connection housing, sensor: Connect connecting cable.
3. Transmitter: Connect connecting cable.
4. Transmitter: Connect signal cable and cable for supply voltage.
NOTICE
Insufficient sealing of the housing!
Operational reliability of the measuring device could be compromised.
‣
Use suitable cable glands corresponding to the degree of protection.
1. Remove dummy plug if present.
2. If the measuring device is supplied without cable glands:
Provide suitable cable gland for corresponding connecting cable.
3. If the measuring device is supplied with cable glands:
Observe requirements for connecting cables → 35.
+
+
-
-
D
Proline Promass E 500 PROFINET
Assignment
TD +
RD +
TD –
RD –
Plug/socket
Socket
Endress+Hauser