Post-Installation Check - Endress+Hauser Proline Promass E 500 PROFINET Operating Instructions Manual

Coriolis flowmeter
Table of Contents

Advertisement

Installation
34
ES
C
+
2.
1. Depending on the device version: Loosen the securing clamp of the connection
compartment cover.
2. Unscrew the connection compartment cover.
3. Turn the display module to the desired position: max. 8 × 45° in each direction.
4. Screw on the connection compartment cover.
5. Depending on the device version: Attach the securing clamp of the connection
compartment cover.
6.3

Post-installation check

Is the device undamaged (visual inspection)?
Does the measuring device conform to the measuring point specifications?
For example:
• Process temperature →  269
• Process pressure (refer to the section on "Pressure-temperature ratings" in the "Technical
Information" document)
• Ambient temperature
• Measuring range
Has the correct orientation for the sensor been selected ?
• According to sensor type
• According to medium temperature
• According to medium properties (outgassing, with entrained solids)
Does the arrow on the sensor nameplate match the direction of flow of the fluid through the
piping →  24?
Are the measuring point identification and labeling correct (visual inspection)?
Is the device adequately protected from precipitation and direct sunlight?
Are the securing screw and securing clamp tightened securely?
E
1.
3 mm
Proline Promass E 500 PROFINET
ES
C
+
E S
C
E
+
E
3.
Endress+Hauser
A0030035

Advertisement

Table of Contents
loading

Table of Contents