Post-Installation Check - Endress+Hauser Levelflex M FMP40 Interface Brief Operating Instructions

Hide thumbs Also See for Levelflex M FMP40 Interface:
Table of Contents

Advertisement

Mounting
2.3.8 Turn housing
After mounting, the housing can be turned 350° in order to simplify access to the display and
the terminal compartment. Proceed as follows to turn the housing to the required position:
• Undo the fixing screws (1)
• Turn the housing (2) in the required direction
• Tighten up the fixing screws (1).
2
1
2.4

Post-installation check

After the measuring instrument has been installed, perform the following checks:
• Is the measuring instrument damaged (visual check) ?
• Does the measuring instrument correspond to the measuring point specifications such as
process temperature/pressure, ambient temperature, measuring range, etc..?
• Are the measuring point number and labeling correct (visual check ?
• Is the measuring instrument adequately protected against rain and direct sunlight (see Chapter
"Accessories" in the Operating Instructions on the CD-ROM) ?
10
F12/F23 housing
Levelflex M FMP40 4...20 mA HART
T12 housing
2
1
allen key
4 mm/0.1"
L00-FMP4xxxx-17-00-00-en-028
Endress+Hauser

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Levelflex M FMP40 Interface and is the answer not in the manual?

Questions and answers

Table of Contents