Site Preparation Checklist for EX4300 Switches

The checklist in
Table 53 on page 122
for EX4300 switch installation.
Table 53: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure the distance between external
power sources and the switch installation
site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches
you want to install.
Rack or Cabinet
summarizes the tasks you need to perform when preparing a site
For More Information
"Environmental Requirements
and Specifications for EX Series
Switches" on page 124
"AC Power Supply
Specifications for EX4300
Switches" on page 103
"DC Power Supply
Specifications for EX4300
Switches" on page 118
"EX4300 Switches Hardware
Overview" on page 2
Performed by
Date