Site Preparation Checklist for EX4200 Switches

The checklist in
Table 17 on page 58
EX4200 switch installation.
Table 17: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches
you want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the switch.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
summarizes the tasks you need to perform when preparing a site for
For More Information
"Environmental Requirements and Specifications for EX Series Switches" on page 60
"Power Specifications for EX4200 Switches" on page 53
"EX4200 Switches Hardware Overview" on page 19
"Rack Requirements" on page 66
"Cabinet Requirements" on page 67
"Clearance Requirements for Airflow and Hardware Maintenance for EX4200 Switches"