Connectors are on rear.
J1-2 Alarms and Inputs - Connect to office alarms and signals. See Information: Alarm Connections for Details
J5 LAN - Connect to Ethernet network.
Step 8 - Install 1-Wire Battery Temp and Voltage Monitor per Galaxy Pulsar
Edge Controller Quick Start Guide -
Connect 1-Wire Battery Temp and Voltage Monitor to J3
Firmly push the rectifier into the rectifier slot.
Tighten the thumb screw until the rectifier is seated.
NOTE: When installing a rectifier in a powered system
the RUN LED on the rectifier will blink until
communication with the controller is established.
Verify that all AC, DC and Alarm connections are complete and secure. Turn on AC input breakers. If there are no
alarms, make required adjustments to the default settings on the controller for this installation.
Verify and edit controller basic configuration parameters per site engineering instructions.