To edit the run schedule, follow these steps:
Note: Only runs that are not started yet (with Pending Run status) can be rearranged.
1. On the Running Status screen, tap Edit run schedule.
2. Tap the row corresponding to the plate that you want to move.
3. Perform one of the following actions:
Tap Move up to move the plate run to an earlier position.
Tap Move down to move the plate run to a later position.
Tap Remove to cancel the plate run. Tap Back to running status overview to go back to the
Running status window.
Viewing notifications
If the QIAcuity detects an error that affects the workflow of the instrument that the user can resolve,
a notification displays on the screen.