Method For Checking After Finishing Work - Komatsu D85EX-18 Operation & Maintenance Manual

Table of Contents

Advertisement

MACHINE OPERATIONS AND CONTROLS
4.
Set blade control lever (5) to LOWER position (C) and low-
er the blade to the ground.
5.
Return blade control lever (5) to HOLD position (B).
6.
Set ripper control lever (6) to LOWER position (c) and low-
er the ripper to the ground.
7.
Return blade control lever (6) to HOLD position (b).
8.
Set work equipment lock lever (7) to LOCK position (L).

METHOD FOR CHECKING AFTER FINISHING WORK

CHECKS BEFORE STOPPING ENGINE
On the machine monitor, check the engine coolant tempera-
ture, hydraulic oil temperature, power train oil temperature, en-
gine oil pressure, remaining fuel level, and remaining DEF lev-
el.
CHECKS AFTER STOPPING ENGINE
1.
Perform walk-around check for oil or coolant leakage and for abnormality in work equipment, exterior parts,
and undercarriage.
If oil or coolant leakage or any abnormality is detected, repair it.
2.
Check DEF tank, pump, injector, hose, and joint for leakage.
If any abnormality is found, ask your Komatsu distributor for repair.
3.
Fill the fuel tank.
4.
Check the engine compartment for paper and debris. Clean out any paper and debris to avoid a fire hazard.
3-190
OPERATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

D85px-1822001

Table of Contents