Chapter 9: Cabling the Networking Ports
Figure 66. Installing SFP+ Transceivers
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining transceivers in the switch.
5. Remove the dust cover from the transceiver. Refer to Figure 67.
Figure 67. Removing the Dust Cover from an SFP or SFP+ Transceiver