Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Allied Telesis Manuals
Switch
CentreCOM GS970EMX/52
Installation manual
Figure 78: Removing The Dust Cover From An Sfp+ Transceiver; Figure 79: Positioning The Sfp+ Handle In The Upright Position - Allied Telesis CentreCOM GS970EMX/52 Installation Manual
Gigabit layer 3 lite access switches with 10 gigabit uplinks
Hide thumbs
1
2
3
4
5
6
Table Of Contents
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
page
of
174
Go
/
174
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Advertisement
Figure 78. Removing the Dust Cover from an SFP+ Transceiver
6. Verify that the transceiver handle is in the upright position. Refer to
Figure 79.
SFP+ Handle
Figure 79. Positioning the SFP+ Handle in the Upright Position
7. Connect the fiber optic cable to the transceiver. Refer to Figure 80 on
page 154. The cable connector should fit snugly into the port, and the
tab should lock the connector into place.
CentreCOM GS970EMX Series Installation Guide for Standalone Switches
153
Table of
Contents
Previous
Page
Next
Page
1
...
152
153
154
155
Advertisement
Table of Contents
Related Manuals for Allied Telesis CentreCOM GS970EMX/52
Switch Allied Telesis CentreCOM GS970EMX Series Installation Manual
Fanless gigabit layer 3 lite access switches (126 pages)
Switch Allied Telesis GS970EMX/10 Installation Manual
Gigabit layer 3 ethernet switch (98 pages)
Switch Allied Telesis AT 8088/SC AT-8088/SC AT-8088/SC Quick Install Manual
Rapier series (12 pages)
Switch Allied Telesis Rapier Switch Quick Install Manual
Rapier series (11 pages)
Switch Allied Telesis Rapier G6 Quick Install Manual
Rapier switch (13 pages)
Switch Allied Telesis Rapier G6 Quick Install Manual
Rapier switch (12 pages)
Switch Allied Telesis GS950 PS Series Product Information
Gs950 ps series gigabit websmart poe+ edge switches (3 pages)
Switch Allied Telesis GS950 PS V2 Series Installation Manual
Gigabit ethernet poe+ switches (108 pages)
Switch Allied Telesis GS950 Eco Series Specifications
Eco-friendly gigabit websmart switches (2 pages)
Switch Allied Telesis GIGABIT ECO-FRIENDLY AT-GS900/16 Installation Manual
Gigabit eco-friendly ethernet switches (45 pages)
Switch Allied Telesis GS980EM Series Installation Manual
Gigabit layer 3+ ethernet switches with external power supply unit (124 pages)
Switch Allied Telesis CentreCOM GS970M Series Installation Manual
Managed gigabit ethernet switch (100 pages)
Switch Allied Telesis CentreCOM GS970M Series Quick Installation Manual
Gigabit ethernet switches (22 pages)
Switch Allied Telesis GS950PS V2 Series Quick Installation Manual
Gigabit websmart ethernet switches (25 pages)
Switch Allied Telesis AT-GS920/16 Installation And User Manual
Gigabit ethernet unmanaged switches (118 pages)
Switch Allied Telesis CentreCOM GS980M Series Quick Installation Manual
Gigabit ethernet switches (20 pages)
Related Content for Allied Telesis CentreCOM GS970EMX/52
SwitchBlade x3112 Figure 88: Removing The Dust Cover From The Sfp Transceiver In The At-Sbx31Gs24 Line Card
Allied Telesis SwitchBlade x3112
x330-52GTX Figure 78: Removing The Dust Cover From An Sfp+ Transceiver
Allied Telesis x330-52GTX
x530 Series Figure 67: Removing The Dust Cover From An Sfp Or Sfp+ Transceiver
Allied Telesis x530 Series
SwitchBladex8112 Figure 108: Removing The Dust Cover From An Sfp+ Transceiver In The At-Sbx81Cfc960 Controller Fabric Card
Allied Telesis SwitchBladex8112
IE200 Series Figure 14: Removing The Dust Cover From An Sfp Transceiver
Allied Telesis IE200 Series
x330 Series Figure 71: Removing The Dust Cover From An Sfp+ Transceiver
Allied Telesis x330 Series
x330 Series Figure 73: Removing The Dust Cover From An Sfp+ Transceiver
Allied Telesis x330 Series
CentreCOM GS970EMX Series Figure 71: Removing The Dust Cover From An Sfp+ Transceiver
Allied Telesis CentreCOM GS970EMX Series
AlliedWare Plus Figure 86: Removing The Dust Cover From An Sfp Or Sfp+ Transceiver
Allied Telesis AlliedWare Plus
GS970EMX/10 Figure 44: Removing The Dust Cover From An Sfp+ Transceiver
Allied Telesis GS970EMX/10
x330-10GTX Figure 44: Removing The Dust Cover From An Sfp+ Transceiver
Allied Telesis x330-10GTX
GS950 PS V2 Series Figure 41: Removing The Dust Cover From An Sfp Transceiver
Allied Telesis GS950 PS V2 Series
IE200 Series Figure 27: Removing The Dust Cover From An Sfp Transceiver
Allied Telesis IE200 Series
AlliedWare Plus x220 Series Figure 34: Removing The Dust Cover From An Sfp Transceiver
Allied Telesis AlliedWare Plus x220 Series
IE340 Series Figure 31: Removing The Dust Cover From An Sfp Transceiver
Allied Telesis IE340 Series
XS900MX Series Figure 41: Removing The Dust Cover From An Sfp Transceiver
Allied Telesis XS900MX Series
This manual is also suitable for:
Centrecom gs970emx/10
Centrecom gs970emx/20
Centrecom gs970emx/28
Centrecom gs970emx series
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL