Figure 40: Inserting The Sbxpwrsys1-80 Dc Power Supply; Figure 41: Lowering The Locking Handle On The Sbxpwrsys1-80 Dc Power Supply - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Stand-alone switches
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

SBx908 GEN2 Installation Guide for Stand-alone Switches
Figure 40. Inserting the SBxPWRSYS1-80 DC Power Supply
7. Gently press on the faceplate of the power supply to seat the unit on
the connector on the backplane of the chassis, and lower the locking
handle to secure the unit in the chassis. Refer to Figure 41.
Figure 41. Lowering the Locking Handle on the SBxPWRSYS1-80 DC
Power Supply
77

Advertisement

Table of Contents
loading

Table of Contents