Installation Overview - Allied Telesis x530DP Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.5.1-2.1
Table of Contents

Advertisement

Installation Overview

The following steps summarize the installation procedure for the RKMT-
SL01 Rack Mount Kit:
1. Verify the contents of the shipping box. Refer to "Unpacking the
Shipping Container" on page 186.
2. Attach the outer rails to the equipment rack. Refer to "Installing the
Outer Rails on the Equipment Rack" on page 188.
3. Determine the lengths of the extension brackets and install the
brackets on the inner rails. Refer to "Installing the Extension Brackets
on the Inner Rails" on page 190.
4. Attach the inner rails to the switch. Refer to "Installing the Inner Rails
on the Switch" on page 196.
5. Slide the switch into the outer rails. Refer to "Installing the Switch in the
Equipment Rack" on page 197.
x530DP Series Installation Guide for Virtual Chassis Stacking
185

Advertisement

Table of Contents
loading

This manual is also suitable for:

X530dp-28ghxmX530dp-52ghxm

Table of Contents