Installation Overview

34
Table 7 lists the installation procedures for a stack of the AT-9424Ts,
AT-9424Ts/XP, and AT-9448Ts/XP Switches. The procedures, which are
divided into four chapters, should be performed in the order presented in
the table. Allied Telesis recommends that you print this table and place a
check mark beside the procedures as you complete them.
Table 7. Installation Procedures
Step
Chapter 2, "Installing the Hardware"
1
2
3
4
5
6
7
8
9
Chapter 3, "Preparing the Switches"
10
11
12
13
14
Procedure
Refer to "Reviewing the Safety Precautions" on
page 36
Refer to "Planning the Installation of a Stack" on
page 38
Refer to "Maximum Number of Switches in a
Stack" on page 39
Refer to "Unpacking a Switch" on page 40
Refer to "Installing the AT-StackXG Stacking
Module" on page 41
Refer to "Installing the Power Cord Retaining Clip
(AC Switches Only)" on page 44
Refer to "Disconnecting the Network Cables" on
page 45
Refer to "Installing the Switches in an Equipment
Rack" on page 46
Refer to "Labeling the Switches" on page 48
Refer to "Powering on a Switch" on page 50
Refer to "Starting a Local Management Session"
on page 52
Refer to "Verifying the AT-S63 Version Number"
on page 54
Refer to "Updating the AT-S63 Management
Software" on page 55
Refer to "Assigning the Static Module ID Number
1 to the Master Switch" on page 56