Table 8 lists the installation procedures for the AT-DC2552XS / L3
Enterprise Core Switch. The procedures should be performed in the order
presented in the table.
Table 8. Installation Procedures
Step
1
"Reviewing Safety Precautions" on page 47
2
"Planning the Installation" on page 51
3
"Unpacking the Switch" on page 52
4
"Installing the Switch on a Desktop" on page 56 OR
"Installing the Switch in an Equipment Rack" on page 57
5
"Installing Power Supply Module" on page 60
6
"Installing Fan Module" on page 64
7
"Installing SFP+ Transceivers and Cables" on page 68
8
"Installing QSFP+ Transceivers and Cables" on page 73
9
"Powering On the Switch" on page 78
10
"Managing the Switch" on page 81