Figure 37: Tightening The Two Captive Screws On The At-Fan09 Module; Figure 38: Storing The At-Fan09Adp Module In An Anti-Static Bag - Allied Telesis AT-x930-28GTX Installation Manual

Gigabit layer 3 ethernet switches
Hide thumbs Also See for AT-x930-28GTX:
Table of Contents

Advertisement

Figure 37. Tightening the Two Captive Screws on the AT-FAN09 Module
13. Store the AT-FAN09ADP Module in an anti-static bag and place it in a
safe location. Refer to Figure 38.
Figure 38. Storing the AT-FAN09ADP Module in an Anti-static Bag
14. Perform one of the following:
To install the switch on a table, go to Chapter 5, "Installing the
x930 Series Installation Guide for Stand-alone Switches
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x930-28gpxAt-x930-28gstxAt-x930-52gtxat-x930-52gpx

Table of Contents