REP 9.18 Pressure Equalizer Tubes
Parts List on
PL
9.7,
PL 9.8
Switch off the Main Power Switch. Disconnect the Power Cord.
Removal
1.
Remove the Developer Module
(REP
1
Remove the Grip
Ring
8850/ 510DP
WARNING
9.5).
3
Remove the Pres-
sure Equalizer Tube
2
Remove the three
gears
Figure 1 Removing the Pressure Equalizer Tubes
Do not rotate the Auger Gears individually more than the slight amount required for removal or
to mesh the teeth during reinstallation. If the factory setting of the augers is changed during the
procedure, perform
ADJ 9.6
Augers.
2.
(Figure 1): Remove the Pressure Equalizer Tubes.
3.
Using a vacuum cleaner, remove the impacted Developer Material from the Housing
where the Pressure Equalizer Tubes are attached. Pay special attention to the inside of
the bottom channel.
4
Remove the screw
6
Remove the Pressure
Equalizer Tube
03/2003
4-93
CAUTION
5
Remove the
retainer
Repairs and Adjustments
REP 9.18