Installing the Grooming Reel Bearing (continued)
Greensmaster
®
eFlex 1800, 2100 and 2120
12189SL Rev E
3. Install grooming reel, front roller, and right drive plate to right side of cutting
unit; refer to
Grooming Reel (Forward Rotating Groomer Drive) (page 8–10)
or
Grooming Reel (Counter Rotating Groomer Drive) (page
4. Check and adjust grooming reel height and mower height-of-cut settings.
5. Install cutting unit to the machine.
6. Lubricate groomer bearings.
7. Connect the battery pack; refer to
(page
8–3).
Note: After greasing groomer bearings, operate groomer for 30 seconds,
stop machine, and wipe any excess grease from groomer shaft and seals.
Connecting the Lithium Battery Pack
Page 8–23
8–14).
Belt Driven Groomer: Service and Repairs