BRP Evinrude E-Tec Series Service Manual page 349

115,150,175,200 hp, 60 v models
Hide thumbs Also See for Evinrude E-Tec Series:
Table of Contents

Advertisement

Remove the forward gear bearing only if it needs
to be replaced. If removal of the bearing is neces-
sary, use Large Puller Jaws, P/N 432129, and
Puller Bridge, P/N 432127, with an appropriate
base. Leave the rollers in to allow for good contact
with the puller jaws.
If removed, install a new forward gear bearing.
Apply Needle Bearing grease to 25 new rollers.
Install the rollers in the bearing.
Using Bearing Installation Tool, P/N 339778,
install the bearing, lettered side facing tool.
Install the thrust bearing on the forward gear.
Place the bearing housing on the forward gear.
31958
Install 0.030 in. (0.7 mm) of shims and the thrust
bearing in the flange. Install the thrust bearing on
the forward gear.
31956
GEARCASE
COUNTER ROTATION
31960
31960
31955
347
12

Advertisement

Table of Contents
loading

Table of Contents