Timing Verification; Tps Calibration - BRP Evinrude E-Tec Series Service Manual

115,150,175,200 hp, 60 v models
Hide thumbs Also See for Evinrude E-Tec Series:
Table of Contents

Advertisement

Timing Verification

Use the Evinrude Diagnostics Software program
to synchronize the mechanical timing of the out-
board with the electronic timing control function of
the EMM.
Timing Adjustment Screen
Perform timing verification after any of the follow-
ing procedures:
Powerhead replacement
Crankshaft replacement
Flywheel removal or replacement
CPS replacement
EMM replacement
EMM software replacement (reprogramming)
Make sure the timing pointer is
IMPORTANT:
set and the outboard reaches operating tempera-
ture before timing verification is performed.

TPS CALIBRATION

Use the Evinrude Diagnostics Software program
to tell the EMM what the throttle position sensor
voltage level is when the throttle plates begin to
open.
Remove the air silencer.
On the Settings screen of the diagnostic software,
click the "Set TPS Calibration" button.
1
005148
1. TPS Calibration button
While holding the throttle plates closed, advance
the throttle linkage until it stops. The "Measured
TPS Calibration" field on the screen will increase.
Click the "Working" button in the software to cali-
brate the TPS.
Install the air silencer.
Perform TPS Calibration after replacing or adjust-
ing any throttle body or throttle linkage parts.
ELECTRICAL AND IGNITION
TPS CALIBRATION
6
006311
159

Advertisement

Table of Contents
loading

Table of Contents