Install pins from Alignment Pin Kit, P/N 5007167,
as shown. Tighten pins until fully seated.
Apply Triple-Guard grease to the threads, and
Gasket Sealing Compound to the shank of the
powerhead screws.
Apply Triple-Guard grease to upper mount screw
threads.
With alignment pins in place, loosely install
remaining powerhead screws and upper mount
screws.
2
1
4
005274
1. Large powerhead screws
2. Small powerhead screws
3. Upper mount screws
4. Alignment pin tool
Torque the large powerhead screws 1 through 4
•
to 20 to 22 ft. lbs (27 to 30 N·m).
Remove Alignment Pins and torque screws 5
•
through 7 to 20 to 22 ft. lbs (27 to 30 N·m).
Torque the four small powerhead screws to 60
•
to 84 in. lbs. (7 to 9.5 N·m).
Torque upper mount screws to 110 to 130 ft.
•
lbs. (149 to 176 N·m). Confirm that screw heads
are tight against steering arm.
005275
C
Alignment
6
Pin here
1
3
A
Large screw torque sequence, 1–7
Small screw torque sequence, A–D
IMPORTANT:
screws after outboard has been run at full operat-
ing temperature.
POWERHEAD
INSTALLATION
D
4
2
5
Alignment
Pin here
B
7
Retorque powerhead mounting
3
2
1
005277
10
005244
263