General - BRP Evinrude E-Tec Series Service Manual

115,150,175,200 hp, 60 v models
Hide thumbs Also See for Evinrude E-Tec Series:
Table of Contents

Advertisement

Torque main bearing screws in stages to 31 to 35
ft. lbs. (42 to 47.5 N·m). Begin with the center
screws and work outward in a spiral pattern.
1
1. Main bearing screws (6 on V4; 8 on V6)
Apply Triple-Guard grease to crankcase flange
screws. Install screws and torque to 60 to 84 in.
lbs. (7 to 9.5 N·m).
1
1. Flange screws (12 on V4; 16 on V6)
Test that the crankshaft spins freely without bind-
ing.
IMPORTANT:
assembled, allow at least two hours for Gel-Seal II
to cure before running outboard.
1

General

Connect all crankcase recirculating hoses. Refer
to Recirculation Hose Routings and Check
Valve Diagrams – V4 on p. 213, Recirculation
Hose Routings and Check Valve Diagrams –
V6 on p. 211, or POWERHEAD VIEWS on p. 266.
Install pressure valve assembly. Refer to PRES-
SURE RELIEF VALVE SERVICING on p. 233.
005313
Install the throttle body and reed plate assemblies.
Refer to INTAKE MANIFOLD on p. 196.
Lubricate shift linkage bosses at the base of the
crankcase with Triple-Guard grease. Insert bush-
ings into bosses.
Apply Triple-Guard grease to the shaft of the shift
1
lever assembly. Guide shaft through bushings in
crankcase.
Install shift rod lever and tighten retaining screw
60 to 84 in. lbs. (7 to 9.5 N·m).
Apply Triple-Guard grease to shoulder of shift arm
screw and Nut Lock to threads. Install arm, screw,
and washer and torque screw to 120 to 144 in.
005306
lbs. (14 to 16 N·m).
1
1. Shift arm screw
2. Shift lever screw
POWERHEAD
ASSEMBLY
After
powerhead
has
been
10
2
005294
259

Advertisement

Table of Contents
loading

Table of Contents