Honeywell Vocollect Hardware Reference Manual page 243

Table of Contents

Advertisement

Installer must verify that the installation meets all local building codes.
Avoid potential hazards (electrical wires, waterlines, and similar building components) when drilling into the wall.
Avoid blocking power outlets and other wall receptacles when installing the rail and charger.
Anchoring a wall mount rail to a wall stud generally results in a more stable installation. If you drill into a wall
stud, do not use a screw anchor in that hole.
If you are mounting two chargers side by side, you must leave at least 1 in. (2.54 cm.) of space between the two
units to allow clearance for the locking arms.
To allow for proper attachment, seating, and removal of the charger unit the rails must be anchored to the wall at
least 12 in. (30.5 cm.) from the floor with the product not exceeding 2 meters (200 cm.) from the floor
If you are mounting a charger directly above another charger, Honeywell recommends clearance of at least 10 in.
(25.4 cm.) between DIN rails with the product not exceeding 2 meters (200 cm.) from the floor.
Part Number in Diagram
1
2
3
4
5
Note: The 6-Bay charger view is similar, but it has a different USB slot location and does not have a large
power supply. Instead, the power supply is a small wall-mounted supply at the end of the cord.
Mounting the SRX2 Battery Chargers
You will need:
DIN rail, slotted steel 35 mm X 15 mm, Honeywell Part #CM-1000-20-101 or customer-supplied DIN rail
meeting the following specifications
Figure 173: SRX2 20-Bay charger - back view
Description
power supply
rubber stop for leveling charger against wall
locking arm for securing charger to DIN rail
mounting hook for hanging charger on DIN rail
USB port for charger software upgrades
| Chargers | 243