A. Notes on commissioning and service
A.1
Preparations and overview for commissioning
A.1.1 Checking the axis string
A.1.2 Switching on the power supply, switch−on behaviour
Festo P.BE−CPX−CMA X−CONTROL−EN en 0908NH
Prior to commissioning:
Check the complete system structure, especially the drive
·
tubing and the electrical installation (see CMAX system
description).
Warning
High acceleration forces at the connected actuators! Unex
pected motion can cause collisions and severe injuries.
Switching on:
·
Always first switch on the power supply and then the
compressed air supply.
Switching off:
·
Before carrying out mounting, installation and mainten
ance work switch off the power supply and the com
pressed air supply, either simultaneously or in the fol
lowing sequence:
1. the compressed air supply
2. the power supply for the electronics/sensors
3. the load voltage supply for the outputs/valves
Always make sure that the compressed air supply and
power supply are switched off and locked before work
ing in the machine area.
A−3