Chapter 2 - Hardware Installation
The Wi² should be mounted vertically on a 2"- 6" pole. Its location should enable easy access to the
unit and its connectors for installation and maintenance and should have a clear or near line of sight
to the area to be covered.
For best performance, the SU-ODU attached to the unit should have clear or near line of sight to the
base station. For further information about the optimal installation location of the SU-ODU refer to
the relevant manual.
18
BreezeMAX Wi² and BreezeACCESS Wi² System Manual