Connecting The Setpoint Device To The Controller; Establishing Equipotential Bonding - DURKOPP ADLER 650-10 Operating Instructions Manual

Hide thumbs Also See for 650-10:
Table of Contents

Advertisement

128
8.9.2

Connecting the setpoint device to the controller

Fig. 86: Connecting the setpoint device to the controller
(1) - Setpoint device for main pedal
Connect the setpoint device to the controller as follows:
1.
Connect the setpoint device for the main pedal to
connector X5b
2.
If present, connect the setpoint device of the additional pedal
to connector X440; the cable hangs freely in the cable har-
ness.
8.9.3

Establishing equipotential bonding

Important
Before putting the machine into operation, you must establish
equipotential bonding in all necessary places.
Establish equipotential bonding as follows:
1.
Establish equipotential bonding as specified in the wiring
diagram ( p. 161).
.
Operating Instructions 650-10 - 03.0 - 08/2016
Setup

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents