Server in rack mode: Install the server into the rack.
Server in tower mode: Return the server to an upright position.
18. Connect all peripheral cables to the server.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
21. Power up the server.
The installation is complete.

Installing the four-bay LFF hot-plug drive cage

The four-bay LFF hot-plug drive cage can be installed in both box 1 and box 2.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
Four-bay LFF hot-plug drive cage option
LFF hot-plug drive option
T-15 Torx Screwdriver
Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
Server in rack mode: Remove the server from the rack.
Server in tower mode: Position the tower server for hardware configuration.
5.
Remove the access panel.
6.
Remove the front bezel.
7.
Remove the PCI air baffle.
8.
Remove the system air baffle.
9.
Disconnect all existing drive cage cables.
10. Remove the installed drive cage assembly.
Hardware options installation