Chapter 1. Introduction
Installation Overview
Vol. III-1-2
Figure 1-1 shows an overview of a typical installation procedure.
9500 MXC Hardware Installation Overview
Figure 1-1.
Hardware Installation
Pre-Installation
Customer supplied tools and equipment
Unpacking the equipment
Verifying the system configuration
Check basic components
Check kits and accessories
Installation
Antenna
ODU
ODU grounding
ODU cable
Cable running and fastening
Fitting and weatherproofing connectors
Cable grounding
Lightning surge suppressor
INU or IDU
INU plug-in cards
Traffic and NMS cables
Options
EOW
AC power supply
Antenna Alignment
Power on
Connect PC and logon
Check status
Configure
Align the antenna
RSSI at the ODU or,
RSL indication in 9500 MXC CT
Installation can be completed up to antenna alignment without the use of 9500
MXC CT, the PC based craft terminal. 9500 MXC CT is required to check and
configure a 9500 MXC Node or Terminal.
9500 MXC CT
Alcatel-Lucent