Chapter 2. Outdoor Installations
Suppressor Installed Inside
Figure 2-17.
Inside
Lightning Suppressor
Ground Lead
Equipment
Racks
Grounded Copper Plate
Suppressor Installed Outside
Figure 2-18.
Inside
Ground Lead
Equipment
Racks
Grounded Copper Plate
Installing Building Entry Suppressor Procedure
Vol. III-2-28
Outside
Wall Gland
Ground Kit
Master Ground Bar
Station Ground
Outside
Lightning Suppressor
Wall Gland
Ground Lead
Master Ground Bar
Station Ground
To install the lightning surge suppressor at building entry:
1. Determine where the suppressor is to be installed. The normal location is just
inside the building.
2. Trim the cable from the ODU at the point where the suppressor is to be
installed. Terminate the cable with a Type N male connector from the ODU
Accessories Kit, and connect to the Type N female connector on the
Ground Kit
Alcatel-Lucent