Chapter 2 Installing and Removing Management Blades
2.1 Before Starting
Perform the following preparations before installing/ removing a Management Blade
to the chassis.
■ Preparations
Before starting prepare the following.
• Management Blade
• The server and manual for each optional component
• Management terminal (PC etc.)
It is necessary to have a normal environment in which Web browser and terminal software operates in
the management terminal. Also, LAN ports or serial ports are necessary as communication interfaces.
14