Brief Instructions On Commissioning Et 200S - Siemens Simatic ET 200S Operating Instructions Manual

Distributed i/o system
Hide thumbs Also See for Simatic ET 200S:
Table of Contents

Advertisement

Brief instructions on commissioning ET 200S

2.1
Commissioning on PROFIBUS DP
2.1
2.1.1
Introduction
Introduction
Using the following simple examples, you will learn how to commission the ET 200S on the
PROFIBUS DP step by step:
• ET 200S installation and wiring up
• Configuring ET 200S in the SIMATIC manager
• Creating a user program
• Switching on ET 200S
• Evaluating diagnostic messages:
Requirements
• You have set up an S7 station consisting of a power supply component and a DP master
• The PD must be connected to the DP master.
ET 200S
Operating Instructions, 12/2005, A5E00515771-03
– Removing and inserting of modules
– Switching off the load voltage on the power module
– Wire break in the actuator wiring on the digital output module
(e. g. CPU 315-2 DP). A CPU 315-2 DP is used as a DP master for this example. Any
other DP master (IEC 61784-1:2002 Ed1 CP 3/1) standard can of course also be used.
STEP 7
(starting V5.0 with ServicePack 3) is completely installed on you PD. You have
STEP 7
knowledge.
2
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents