Brief Instructions on Commissioning
ET 200S
2.1
Commissioning on PROFIBUS DP
Introduction
The following simple example teaches you step by step how to commission the
ET 200S on PROFIBUS DP:
• Installing and wiring the ET 200S
• Configuration with STEP 7 using the device database file
• Integration in the user program
• Switching the ET 200S on
• Evaluating the diagnosis:
-- Removal and insertion of modules
-- Switching off the load voltage on the power module
-- Wire break of the actuator wiring on the digital output module
ET 200S Distributed I/O System
EWA-4NEB 780602402-12
2
2-1