Siemens Simatic ET 200S Operating Instructions Manual page 102

Distributed i/o system
Hide thumbs Also See for Simatic ET 200S:
Table of Contents

Advertisement

Wiring and assembly
5.4 Wiring the ET 200S
Procedure
1. Connecting the supply voltage:
2. Connectinging PROFINET:
1
3
5-22
– Strip the insulation from the wires for the supply voltage of the interface module.
– Secure the individual wires in the screw-type terminal.
– Insert the bus connector into the PROFINET connection.
2-port switch (switched hub) for PROFINET
Labeling strip
Supply voltage (1L+, 2L+, 1M, 2M)
2
Operating Instructions, 12/2005, A5E00515771-03
ET 200S

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents