Nortel CallPilot Install Manual page 214

Nortel callpilot: install guide
Hide thumbs Also See for CallPilot:
Table of Contents

Advertisement

214 Chapter 6 Maintaining a High Availability system
Enabling automatic failovers (start monitoring)
Step
Assumption: This procedure assumes that automatic failovers are currently
disabled.
1
2
3
4
Copyright © 2007, Nortel Networks
.
Action
On the AutoStart Console window, expand Domains >
[AutoStart_Domain] > Resource Groups and then select
CallPilot.
Click the Status tab.
Right-click Resource Groups > CallPilot.
From the shortcut menu, select Monitor Resource Group.
Figure 123
Monitor Resource Group
Result: On Status tab, the Monitoring State turns to green and
shows a status of Enabled. On the Domains pane, the Resource
Groups > CallPilot changes to green. The automatic failover is
enabled.
Nortel CallPilot
High Availability: Installation and Configuration
NN44200-311 01.06 Standard
5.0 15 May 2007
—End—

Advertisement

Table of Contents
loading

Table of Contents