Toro Groundsmaster 7210 Service Manual page 293

Models with yanmar engine
Hide thumbs Also See for Groundsmaster 7210:
Table of Contents

Advertisement

Assembling the Cutting Deck Lift Arms
Groundsmaster 7210
16222SL Rev C
g033700
1.
Carrier frame
g033702
1. Check the flange bushings in the carrier frame for wear or damage
207).
Note: Replace the flange bushings if necessary.
2. Install the lift arm components as shown in
A. If the ball joints were removed from the link (item 4 in
the ball joints equally on both ends of the link. Adjust the center-to-center
length of the link assembly to 45.9 to 46.1 cm (18.070 to 18.180 inches).
Tighten the jam nuts to secure the ball joints to the link
Note: Ensure that the ball joints stay in-line when you tighten the jam
nuts.
Note: Do not change the link assembly length to adjust the height-of-cut
or for any other reason.
Note: When properly installed, the flange nuts (item 9 in
should have the flange surface against the lift arm and not against the
chain.
B. If the bolt (item 10 in
insert the bolt into the upper link of chain and thread the flange nut onto
the bolt with the flange away from the link; torque the flange nut to 67
N∙m (50 ft-lb). When you fasten the chain to the front lift arm; torque the
second flange nut to 67 N∙m (50 ft-lb). When you install the chain to the
rear lift arm; torque the bolts to 67 N∙m (50 ft-lb).
3. Lubricate all the lift arm grease fittings after assembly.
4. Start the engine and fully raise the cutting deck. Shut off the engine and
remove the key from the key switch.
Figure 207
2.
Flange bushing (2 each)
Figure 208
Figure
204) was removed from the deck lift chain,
Page 6–31
Figure 204
and
Figure
Figure
204), install
(Figure
Figure
Chassis: Service and Repairs
(Figure
206.
208).
204)

Advertisement

Table of Contents
loading

Table of Contents