Gateway Controller Installation - Avaya CS 1000E Upgrade Procedures

Hide thumbs Also See for CS 1000E:
Table of Contents

Advertisement

Upgrading Small System hardware
Page 85 of 226

Gateway Controller installation

Reuse the existing 3-port SDI cable (NTBK48) for installation of a Gateway
Controller in a MG 1000E cabinet or chassis. Connect it to the SDI port on
the cabinet and the COM RS232 port on the chassis. Figure on
page 85
illustrates the two connectors.
Figure 12
NTBK48 connectors
The 3-port SDI cable is not required for a Gateway Controller installation in
a MG 1010 chassis. The MG 1010 MGU card faceplate ports provide the
serial connectors. Use the NTC325AAE6 serial port adapter with a MG 1010.
Avaya Communication Server 1000E Upgrade
Hardware Upgrade Procedures

Advertisement

Table of Contents
loading

Table of Contents