Installing The Cp Pm Or Cp Dc Card - Avaya CS 1000E Upgrade Procedures

Hide thumbs Also See for CS 1000E:
Table of Contents

Advertisement

Page 178 of 226
NN43041-464
Standard 05.04
Installing a Signaling Server
The following procedures describe how to install the Server card in a Media
Gateway.
Perform the following procedure to install a CP PM or CP DC card in a Media
Gateway.
Procedure 24

Installing the CP PM or CP DC card

1
Ensure that the security dongle (the one that comes as part of the
software kit) is inserted on the Server card.
Note 1: This first step is applicable only when the Server card is used as
a Call Server.
Note 2: For CP PM only, remove the retainer clip from the FMD slot
when the card is used as a Signaling Server. The clip must be removed
to prevent it from shorting out adjacent cards.
2
Ensure that the FMD is correctly inserted and locked in place.
3
Insert the Server card.
Slide the Server cardinto Slot 1 (or higher)
or chassis
.
Slide the Server card into Slot 22 or 23 of the MG 1010 chassis.
4
Lock the card into the faceplate latches.
Proceed to connecting the CP PM or CP DC card, see Procedure 26:
"Connecting a CP PM or CP DC card as a Signaling Server" on
Perform the following procedure to install a CP MG card as a Server in a
Media Gateway. An NTC325AAE6 serial port adapter kit is required.
Procedure 25
Installing the CP MG card
1
Ensure that the security dongle is inserted on the CP MG card.
Note: This first step is applicable only when the CP MG card is used as
a Call Server.
December 2011
End of Procedure
of the MG 1000E cabinet
page 181

Advertisement

Table of Contents
loading

Table of Contents